top of page
Patching
When we patch an area, the following protocol is followed:
-
Saw-cut the area to be repaired.
-
Excavate and remove the existing blacktop surface and haul away.
-
Grade and compact stone sub-base adding stone for leveling.
-
Place asphalt base course.
-
Place asphalt wearing course.
-
Hot tar the edges of the patched area.

bottom of page