top of page

Patching

When we patch an area, the following protocol is followed:

  • Saw-cut the area to be repaired.

  • Excavate and remove the existing blacktop surface and haul away.

  • Grade and compact stone sub-base adding stone for leveling.

  • Place asphalt base course.

  • Place  asphalt wearing course.

  • Hot tar the edges of the patched area.

IMG_0107_edited_edited_edited.png
bottom of page